Cuprinol 5 Star Complete Wood Treatment
- All surfaces should be clean, dry and free from dirt, debris and other contaminates.
- Minimum of 2/3 coats required.
- Ensure timber is fully dry (allow 3 days) before laying plastic floor tiles, foam and rubber-backed carpets, loft insulation etc.
- Treatment will typically dry in 1-3 days.